Get your favorite trails ready to ride.
Washington's trails take a beating over the winter, and the crews who fix them are already lining up the season's work. Evergreen Mountain Bike Alliance builds and maintains the trails riders across the state depend on. That includes storm-battered singletrack in the Central Cascades and the most-ridden systems in King and Spokane County. This spring we're putting crews on the ground across all 10 chapters: 11 projects over 14 days.
This year's campaign runs April 6β19 with a goal of $133,000 across 11 trail projects and 10 chapters. Every dollar is tax-deductible and 100% stays on Washington dirt. Donate here.
Chapter Projects
General Trails Fund β All Chapters
Washington's trails don't maintain themselves, and public funding can't keep up. The General Trails Fund puts your gift to work right away, wherever the need is greatest: crews in all 10 chapters clearing blowdowns, restoring drainage, and protecting tread. Every dollar is flexible and stays on Washington dirt.
Some trails don't fit a single chapter project; they just need fixing. This fund makes sure none of them fall through the cracks.
Central Area Storm Recovery β Central Chapter
In December 2025, an atmospheric river hit the Central Chapter with 80 mph winds, near-70Β° temperatures, and overnight snowmelt. It left landslides, washouts, and entire hillsides of blowdown. Trails that have served this community for decades were closed, buried, or destroyed overnight.
Blowdowns don't move on their own. Your gift puts crews on the ground at Ski Hill, Number 2 Canyon, Echo Ridge, and beyond, so riders can get back out this season. The sooner we start, the sooner these trails reopen.
Raging / Tiger Maintenance β Cascades to Sound
Tiger Mountain and Raging River see over 150,000 riders a year, and their public maintenance funding just got cut. These are Washington's most-ridden backcountry systems, and without this campaign the drainage fails and the tread craters. Your gift funds the professional crews, machine work, and material to keep them riding.
The state pulled back on funding. This is riders filling the gap.
Badger Community Park β Columbia Basin
A municipality hired Evergreen to design a community bike park for Columbia Basin. To secure the full contract and build it, we need to raise an $8,175 cash match. The city is on board and the design is finished. This gift is what turns that contract into trail.
It's a small ask with a big payoff, and it's the kind of work Evergreen does beyond the shovel: earning the trust of cities to build public bike parks.
Cowlitz-Naches Maintenance β Cowlitz-Naches
The Cowlitz-Naches Chapter keeps riders moving across Yakima and Lewis Counties. We'll be maintaining Russell Ridge and the Little Naches corridor: Cow Canyon, Ravens Roost, Mt. Clifty, Quartz Mountain, and Quartz Creek. Your gift goes straight to that work.
Crews get started as soon as conditions allow.
East Area Trail Maintenance β East
Beacon Hill is the most recognized trail system in Eastern Washington, and it needs your help. Along with Antoine Peak, it carries thousands of Spokane-area riders every season. Shrinking state maintenance budgets have left a gap that volunteer days alone can't fill. This campaign funds the crew time and equipment to keep these trails riding at the level this community expects.
If you've ever ridden Beacon, this one's personal.
Naneum Phase 3 β Kittitas
Naneum Ridge is one of Eastern Washington's most beloved trail systems, and Phase 3 finishes it. This is the final push on a multi-year build, with a DNR work order ready to sign and crews standing by. What you give here decides how long crews stay on-site and how much gets done this season. The plan and permits are ready; funding is the last piece.
Funds raised here can also match two Kittitas Stewardship Fund grants, which doubles their impact.
Loup Loup Phase 2 β Methow
Loup Loup has added new trail every season for years, and the system keeps growing. Phase 2 closes the gap: Trails #12 and #14 connect the base to the summit, opening loops that didn't exist before. Your gift extends the build season by about a month, which is often the difference between a trail that works and a trail you drive back for.
Loup Loup is at its turning point.
Swan Creek Education Zone β South Sound
Swan Creek Park in Tacoma is already the South Sound's mountain bike hub, with youth programs, adaptive riding, and one of the region's most accessible trail networks. What it's missing is a dedicated place to teach. This campaign builds that: an education zone with progressive features for first-timers, youth clinics, and adaptive athletes. It's reachable by public transit and backed by Parks Tacoma.
"Bikes can change lives. But only when riders have a place to start." β Heather DeChoudens
Yacolt Burn Maintenance β Southwest
The Yacolt Burn is the top riding destination for Southwest Washington and the greater Portland metro: Cold Creek, Thrilla, Sixth Sense, and 30 miles of high-country singletrack. Years of record-breaking use and shrinking DNR budgets have pushed these trails to a tipping point. This campaign sends a professional crew to armor the corridors and restore storm-damaged zones before the damage compounds. Let's keep the Burn riding the way it should.
If we can't prove we can maintain it, we lose our seat at the table for future expansion.
PGRP Tech Trails + Maintenance β West Sound
Port Gamble is the center of Kitsap County riding, and demand has outpaced what the current maintenance contract can cover. This campaign funds four new technical skill-building trails plus deferred maintenance across the park, with features for youth programs, adaptive riders, and everyone in between. PGRP is open year-round and free to ride, and it belongs to this community. Let's keep it that way.
"I can't believe this place is open year round, and free to use." β Chelsea Kimball, Red Bull Rampage Rider
What Your Gift Does
$100 β Fuel a day of trail work. Keeps a crew moving: fuel for equipment, blowdowns cleared, tread armored across Washington's most-loved trail systems.
$250 β Put a crew lead on trail. Half a day of professional trail work: repairing drainage and rebuilding tread to get Washington's trails ready before you clip in this spring.
$500 β Fund a full day of season prep. Storm damage cleared, drains rebuilt, trail restored. This is the work that makes spring happen on Washington's trails.
Why Evergreen Mountain Bike Alliance
Washington riders are building and protecting the trails we all love. When public agencies pulled back from trail maintenance, Evergreen stepped in. On some of the state's most-used systems, including Tiger Mountain, the Methow, and Swan Creek, we're now the effective maintenance budget.
This spring campaign funds the crews, machines, and materials that make your riding season possible.
The projects are shovel-ready, the permits are approved, and the crews are scheduled. The season just needs you.
Give at give.evergreenmtb.org | Campaign runs April 6β19, 2026. Evergreen Mountain Bike Alliance is a 501(c)(3) nonprofit. Your gift is tax-deductible.



